Set up for metal building manufacturing - $1,000,000 (Colorado)
‹image 1 of 18›
QR Code Link to This Post
Most of what is needed to start manufacturing pre engineered metal buildings.
10,000 pound hydraulic decoiler with coil car (new)
10,000 pound upender, coil tipper (new)
6M auto stacker for PBR panels (new)
PBR ridge bender (new)
20,000 pound telehandler Skyjack ZB20044 (low hours) for coil handling
100’ Kentex frame welder (needs rebuilt)
2 Lincoln frame welders
Air valves and billows for rebuilding Kentex frame welder
Large Sand Blaster (from rebuilding frame welder)
Kenworth W900, no electronics, Doesn’t use oil, new trans 13 speed Eaton, new Michelin steers, new kingpins. Works well.
44’ Transcraft flatbed trailer that has the moffit mount in rear
Moffitt 5k Forklift
L Angle rollformer for flange braces, base and eave angle (new)
42” Bandsaw with 2 powered long roll out tables
42” powered slitter
2 Wilder 1624 table slitters
6.4M Jorns Norma-Line CNC folder
100 FPM PBR panel rollformer (new)
4 uncoilers with stand (new)
Piranha P90 ironworker
5 x 10 plasma table using sheetcam and CandC.com software
2 Hypertherm plasma cutters
2 – Banding Sets
Rollformer for Panel Lock (doors)
75KW diesel generator on trailer
Ingersoll Rand diesel 185 air compressor on trailer
Filemaker software for selling and processing metal buildings (custom)
Filemaker program or computer/server not included